Steel pipe cement-soil pile construction method(synthetic steel pipe pile construction method)

Metodo di costruzione del mucchio di tubi d'acciaio di tipo scavo centrale
Maggio 27, 2022
0

Steel pipe cement-soil pile construction method(synthetic steel pipe pile construction method)

This kind of construction method refers to the construction method of burying the steel pipe piles with side protrusions(肋骨)in the cement-soil column,并集成两者以形成一个复合桩.The so-called cement-soil column is a mixture of cement slurry and soil with a poor mix ratio injected from the cobalt head while drilling with a special drill bit on the pile position.

合成钢管桩的直径(questo è,the diameter of the cement-soil column)is 600~1500mm,which is 200~400mm larger than the outer diameter of the steel pipe,and the applicable pile length is less than 70m. (ghiaia)石头层.这种类型的堆具有高轴承能力的优势,low vibration,low noise and less construction residue.

(1)Simultaneously burying the characteristics of the synthetic steel pipe pile construction method The special drill bit at the bottom of the steel pipe pile is provided with expandable drilling wings and stirring wings and a wing plate to prevent co-rotation;while drilling,the cement slurry is sprayed from the drill bit. ,它与土壤混合以形成水泥土壤桩,侧面和突出的钢管桩同时埋在水泥土柱中,而不松开桩周围的土壤层.

(2)The characteristics of the method of burying synthetic steel pipe piles afterward are to set up a steel casing under the top of the pile.In the case of a stabilized liquid wall,the special drill bit’s drilling stirring wing(right rotation)is used to drill to a certain depth,and the drilling is performed while drilling.喷涂的水泥浆与土壤混合;after reaching the bearing layer of the pile end,the sprayed cement slurry is stirred and mixed with the pile end by the stirring wing(左转);堆埋在水泥的上柱中; finalmente,the steel casing is pulled out to form a pile.

4.5Pre-drilled steel pipe pile construction method

The pre-drilled steel pipe pile construction method refers to first drilling a hole with a size almost the same as the outer diameter of the steel pipe pile on the pile position(soil dumping type)and relaxing only the soil layer in the pile position(no soil dumping type),and then The steel pipe pile is inserted to sink it to the bearing layer of the pile end,and then the pile end treatment method(final strike method,水泥浆液注射方法和扩大的头部加固方法)用于获得具有较大轴承能力的施工方法.For soil-draining pre-drilling,depending on the hydrogeological conditions,drilling rigs can be used to directly form holes,or drilling fluids such as clean water,mud or cement slurry can be injected into the holes from the drill bit while drilling.In the case of pre-drilling without soil dumping,drilling fluids such as bentonite mud and cement slurry are usually injected from the drill bit while drilling to make it mix with soil and sand without soil drainage.

I commenti sono chiusi.