Tubo de Cribado Revestido doble Capa&Tubo de Cribado de Control de arth arena para pozos depetróleo

Tubo Perforado和Tubo de filtro de agua para pozogeotérmico&tubo de filtro de agua de agua del pozo de aire acondicionado
Abril 18,2022
Resumen de Pilotes de tubos de acero ymétododeconducción
梅奥9,2022
0

Tubo de Cribado Revestido doble Capa&Tubo de Cribado de Control de arth arena para pozos depetróleo

  1. Tubo de Cribado Revestido deble Capa

双层衬里筛选管由API标准的基本管组成,,,,双层高精度楔形线滤管管和衬里的滤清器材料
pozos倾斜y pozos dilecionales:
  1.High-precision screening gap can effectively control sand and act as a protective medium
  2.The use of double-layer lined screening pipe can reduce diameter of drilling hole,,,,节省钻井时间,,,,and reduce drilling cost
  3使用双层衬里筛选管可以减少操作员的工作量,,,,并提高钻探的成功率
  4.Filter material can be selected to effectively inhibit microbial ceramic particles,,,,或标准的沙子和树脂颗粒
  5.By adjusting the screening gap,,,,可以有效防止过滤材料的泄漏,,,,服务寿命延长了
  6.In the long run,,,,双层衬里筛选管为客户带来较低的运营成本
  7.Base pipe meeting API standard can be built inside according to the requirements for use to increase the overall bearing capacity of the screening pipe,,,,以便在更深的地层中使用
  Application environment它适合垂直井,,,,倾斜的井,,,,directional wells and most wells as well as deep wells and strata in special environments

2. Tubo de Cribado de Control de arena para pozos depetróleo

油井的砂制筛选管由API标准的基本管和高精度的水过滤管组成
pozos倾斜y pozos dilecionales:
  1.It has strong pressure bearing capacity在内层底管的支持下,,,,即使外部过滤管部分变形,,,,差距不会增加,,,,和沙子控制性能将更加可靠它适合恶劣的服务环境
  2.The gap of the outer-layer screening pipe is uniform,,,,错误小至0.05mm,,,,可以有效控制沙子
  3.Gap density of the screening pipe is better than other screening pipes,,,,这会降低流动阻力并大大提高油气产量
  4.Pipe diameter is smaller,,,,这减少了钻井施工的困难
  5.Continuous V-shaped structure reduces the water penetration speed and alleviates the pressure on the pipe body and the equipment
  6.Materials of the base pipe is J55,K55,N80,API标准的等等,,,,those of the outer-layer screening pipe is304 acero磁素,可氧化,以及其他材料也可以根据客户的要求使用
acero al carbono rociado con plástico u otros materiales requeridos por el cliente: 1000-米深井,,,,油井,,,,geothermal wells and strata with poor construction conditions

Los ComentariosEstánCerrados。